Proposed Area of Excavation (subject to change)
This drawing shows the current proposed construction area for the project (subject to change). The grey shaded areas within the streets represent the extent of the excavation. Over the duration of the project, these areas will be fully excavated to allow replacement of water, sewer, and sanitary services .